My works Ichimatsu yosegi 15-Nov-2024The three-color Ichimatsu Yosegi that I've been working on recently is almost finished. However, it’s not qui... 2024.11.15 My works
My works 3 sun 12 steps boxes (3) 14-Nov-2024I went out this morning, so in the afternoon, I worked on crafting the Aruki (moving panels) for the 3-sun 12... 2024.11.14 My works
My works 3 sun 12 steps boxes (2) 13-Nov-2024Today, I was out for most of the day, so I didn't make much progress on my work...and It was quite hot today ... 2024.11.13 My works
My works 3 sun 12 steps boxes 12-Nov-2024Today, I finished the final coating on the triangular Japanese puzzle box. I’m about to do the final inspecti... 2024.11.12 My works
My works Triangle 7 steps box (5) 11-Nov-2024Over the weekend, I made some progress on the triangular Japanese puzzle box. So, today I’ve already reached ... 2024.11.11 My works
My works Triangle 7 steps box (4) 08-Nov-2024This morning was so cold that the Heating with the air conditioner alone wasn't enough, so I pulled out the e... 2024.11.08 My works
My works Triangle 7 steps box (3) 07-Nov-2024In the past few days, the mornings and evenings have become noticeably cooler, and the season now feels a bit... 2024.11.07 My works
My works Triangle 7 steps box (2) 06-Nov-2024I've been working since this morning!😄 Today, I’m making the shaft for the triangular puzzle box I finished t... 2024.11.06 My works
My works 2 sun puzzle box 05-Nov-2024Today, I was out for an errand, so I only made a bit of progress in the workshop. I attached the other side o... 2024.11.05 My works
My works 5 sun 27 steps box (4) 04-Nov-2024Today, November 4th, is a substitute holiday in Japan for "Culture Day," since it fell on Sunday this year. T... 2024.11.04 My works